Servo Electric Cylinder Startup Guide: Avoid Common Setup Errors
Use a staged commissioning checklist for mounting, wiring, limits, homing and low-speed tests.
Get installation and commissioning right the first time. Check mounting, alignment, wiring and homing to avoid startup delays, positioning errors and premature wear.
Use a staged commissioning checklist for mounting, wiring, limits, homing and low-speed tests.

Check mounting alignment, side load, fasteners, cable routing and travel before putting an actuator into service.
Plan lubrication, alignment checks, inspection and duty-cycle review to support actuator service life.
Evaluate orientation, load direction and external guidance when mounting an electric cylinder.

Assess ambient heat, duty cycle, lubrication and component ratings for high-temperature operation.

Review guarding, energy isolation, end stops and commissioning precautions for electric cylinder systems.
Share your load, stroke, speed, duty cycle and installation drawings. Our engineers will review the cylinder configuration, mounting and motor interfaces before you finalize your machine design.
01 · Share Requirements
Load, motion cycle and installation drawings.
02 · Review Configuration
Confirm cylinder, mounting and motor interfaces.
03 · Approve Drawings
Agree dimensions and verification requirements.
04 · Manufacture & Deliver
Build to the approved configuration and agreed checks.